ROOF DRIP SIDE FINISH MOULDING > INSTALLATION

for Preparation Click here



1. INSTALL ROOF DRIP SIDE FINISH MOULDING CLIP


B213690E01

NOTICE:
Follow these procedures only when replacing the clips.

  1. Remove the tape that remains on the moulding surface of the vehicle body, and then clean the surface with a non-residue solvent.

  1. Using an infrared light, heat the clip installation surface of the vehicle body and roof drip side finish moulding.

    Heating Temperature:
    Area
    Temperature
    Vehicle Body
    40 to 60°C (104 to 140°F)
    Roof Drip Side Finish Moulding
    20 to 30°C (68 to 86°F)

    NOTICE:
    Do not excessively heat the vehicle body or roof drip side finish moulding.

  1. Install new clips in the positions shown in the illustration. Press in the clips by hand.

    Specification:
    Area
    Measurement
    *1
    1.2 mm (0.047 in.)
    *2
    1.8 mm (0.071 in.)
    *3
    53.8 mm (2.118 in.)
    *4
    0.7 mm (0.028 in.)
    *5
    1.8 mm (0.071 in.)
    *6
    28.2 mm (1.110 in.)

    NOTICE:
    After pressing in the clips, wait 30 minutes or more before installing the roof drip side finish moulding.

    HINT:
    1. Minimum hardening time: 30 minutes
    2. Time needed for complete hardening: 24 hours



2. INSTALL ROOF DRIP SIDE FINISH MOULDING


    B213689
  1. Engage the 2 clips and install the roof drip side finish moulding.